Integral test LEE building 2018 (emergency power test)

From ScientificComputing
Revision as of 12:31, 9 May 2018 by Sfux (talk | contribs) (Created page with "On 28. June 2018, an integral test will take place in the LEE building where the Leonhard cluster is located. This means that all facility systems will be tested. The test inc...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

On 28. June 2018, an integral test will take place in the LEE building where the Leonhard cluster is located. This means that all facility systems will be tested. The test includes a complete shutdown of the utility power systems. We don't expect any downtime of the Leonhard cluster, since it is equipped with an uninterruptible power supply (UPS).